Drivers in Wichita Falls should prepare for delays as construction has begun on FM Road 369, stretching from the Wichita River to Old Iowa Park Road. The $2.1 million project, led by the Texas Department of Transportation (TxDOT), will repave the road, repair pavement issues, and lay fresh asphalt.
With the road reduced to one lane and temporary traffic signals in place, commuters should expect slower travel times over the next few months.
Project Details & Traffic Impact
Location: FM 369 from Wichita River to Old Iowa Park Road
Project Cost: $2.1 million
Work Includes:
- Milling up old pavement
- Repairing damaged road base
- Repaving with new asphalt hot mix
Traffic Control Measures
- One lane for both directions of traffic
- Temporary traffic signals to manage vehicle flow
- Pilot car escort to guide drivers through the work zone
- Traffic controls in place only during work hours
Potential Driving Hazards
- Uneven road surfaces where pavement has been removed
- Oncoming vehicles in a shared lane
- Slow-moving construction equipment
Drivers are urged to stay alert, follow signs, and be patient while crews complete the project.
Estimated Completion Time
Projected Completion: 3 months
TxDOT expects all work to be finished by early summer, weather permitting.
Leave a Reply